E) Documentation + Customer Setup

  • Permits/inspection scheduled or completed
  • Warranty registration completed (WR-2024-0089)
  • Thermostat programmed + customer shown basic operation
  • Filter size/type labeled; replacement schedule explained
  • Photos captured (nameplate, wiring, duct transitions)

Event Checklist - Install / Replacement

  • Equipment match (model numbers, AHRI match)
  • Airflow and static pressure within acceptable range
  • Charge verification completed
  • Condensate management verified
  • Electrical verified
  • Thermostat configured and customer trained
  • Membership offer presented and recorded (Accepted)

Back to Journey Hub · Checklists · System docs · Integrations